GEOTECHNICAL STUDY OF MINE DUMPS IN DABWAM VILLAGE OF RIYOM LGA OF PLATEAU STATE FOR THE BACK FILLING OF MINE POND IN THE AREA
ABSTRACT
Backfill is described as waste material that is used to refill the underground voids left during mining for technical or safety purposes. Backfilling has several applications underground and the use of backfill has increasingly become a fundamental part in the entire underground mining activities all over the world. This has greatly been accelerated by the need to increase ore production as well as maintaining regional stability around mine operations. The ever increasing depth of mining operations has largely increased the use of backfill material in underground operations to allow efficient and safe extraction of the mineral deposits. The need for Plateau Mineral Development Company to develop additional production areas further below its current operations has resulted in the sinking of No 4 shaft to a depth of 1500m below surface.
Mining at increased depth may result into increased levels of induced stresses hence this may negatively impact on the stability of the stopes and ultimately can lead to interrupted production. The purpose of this research was to evaluate geotechnically the behaviour of the current and future stopes at increased depth assuming no backfilling is performed and to determine the depth at which backfill may be needed. Numerical modelling using Phase2 computer software and Mathew’s stability graph method was used for the purpose of evaluating, geotechnically, the response of the stopes at different mining depths. Geotechnical investigations were done through core logging, underground structural mapping and laboratory rock tests to determine input parameters into the two evaluation techniques. Numerical modelling and empirical analysis have both indicated that stopes are stable but around 1250mL and below there are chances of increased and excessive instability problems which can lead to increased dilution and risk of collapse.
Suggested improvements to reduce costs and improve copper ore production include the increasing of stope strike length from 20m to 30m on 950mL– 1050mL. Stopes are stable at this new length and the option improved overall ore production in the Bancroft area of the mine by 7.14% and a possible reduction in development costs on slot raises and draw-point cross-cuts by 28.6%. Mining with Cemented Hydraulic Fill (CHF) from 1250mL and below within the steep dipping areas (Bancroft areas) has proved to be very economic as gross revenue after an economic analysis increased by 15.5% as compared to leaving substantial amount of ore in stabilising pillars. With CHF, dilution can also be reduced although not quantified in this research
CHAPTER 1
1.1 Background to the study
The tremendous need for mineral resources as a result of the rapid population growth and economical development in Nigeria, exploration and exploitation of various minerals for several decades has greatly accelerated. The exploitation of minerals on the Jos Plateau dated as far back as 1902 Calvert (1977). Some on large/medium scale while some small scale or artisanal mining in the form of “Lotto” mining, as a result, a broad array of environmental problems related to human mining activities, such as air and water pollution, land resources and inhabited environmental devastation generated by non reclamation of these explored and exploited areas, and other hazards posed by these opened and unreclamed mining ponds etc, are daily becoming matters of concern, and furthermore, as the need for these mineral resources gets on the rise, much pressure is places on the environment with urbanization getting higher.
The goal of mining is to extract valuable minerals from the earth’s crust and this process widely results in the formation of voids both underground and on the surface. Filling of these voids is usually done and the main function of the fill material in mines is to assist in controlling the stability of mine related voids (Potvin, et al., 2005). The use of different types of mine fill and their functions and ultimately the engineering requirements are closely related to the mining methods and mining sequence. Generally mine fill is applicable to artificially supported mining methods and the main functions of fill in artificially supported methods includes ensuring long term regional stability, limiting excavation exposure and also waste disposal.
Many factors, such as rock mass condition, stope geometry, in-situ stress condition, blasting, stope exposure time and geological structures influence stope stability and dilution (Jucheng, 2004). Since backfilling of stopes can help in arresting instability, it is vital to assess the stability of mine stopes and openings underground to identify if backfilling is necessary. In underground mining operations, the mined-out spaces need to be backfilled to maintain the stability of surrounding rock mass and increase the ore recovery (Liung & Mamadou, 2015). This research will mainly consider the effect of rock mass condition, stope geometry and in- situ stress on stability of the stopes to aid on backfilling of the mining voids.
The mining site in Dabwam village takes the form of an anticline and it has a strike length of nearly 11km. On the other hand, the dip of the ponds varies between 15? and 65? and the average dip is 25? at No.3 shaft and 55? at No.1 shaft production areas. The thickness of the ponds varies between 3m-12m and the average is approximately 7m-8m. The mining operations are currently at 950m depth at No.1 shaft and 590m at No.3 shaft and another shaft, No.4, reaching to 1500m has been sunk to get access to mineralisation at greater depth.
Structurally, the ponds are divided into five units. At the bottom is the finely banded dolomitic, calcareous sandstone, in places highly weathered to a brown micaceous clay, ‘A’ Unit varying in width from 0.3m to 1.0m and rock mass rating of 21-40. In some places the rock mass rating is less than 20. Above the ‘A’ Unit is the 1.0-1.5m thickly bedded, ‘B’ Unit. The ‘C’ and ‘D’ Units comprising inter-bedded strong siltstone and dolomite bands, lie below the strong siliceous ‘E’ Unit within which the Assay hanging wall usually lies. The hanging wall formation consists of quartzite and dolomitic sandstone bands, which in some places completely koalinized, resulting into poor hanging wall condition.
There are also three main aquifers at Dabwam village and also the geo-hydrological setting at the mine results in high inflows of water into the mine operation pumping nearly 300 000m3 of water daily. These three aquifers are namely:
? Footwall Quartzite Aquifer
? Footwall Aquifer
? Hanging wall Aquifer
The mine in Dabwam village is in the process of developing other additional areas of production and undertaking key projects to extend the life of the mine and to allow an increase in tin production that is aimed at producing 7.5 Mtpa over the coming five years. Among these projects is the Plateau Mineral Mining Project (PMMP) which is targeted at expanding copper ore production by accessing the ore body that lies further down underneath what the current operations are currently mining. This then involved the sinking of the No. 4 shaft which reaches a depth of 1500m and the commissioning of the 6.0 Mtpa concentrator to enhance mining output and recovery.
Plateau Mineral Development Company has therefore engaged several consultants during the past decade in order to undertake several work to meet its targets and plans of ramping up production. Due to the shape and outline of the ponds, the mine uses a number of mining methods. These methods include:
? Sublevel open stoping (SLOS)
? Long-hole open-stoping (LHOS)
? Post pillar cut and fill (PPCF)
? Modified over-cut benches (MOCB)
? Continuous retreat up dip etc.
However, the conclusions and opinions from the consultant work was for the notion that the mine should adopt mining with backfill in order to break up the resource into several mining blocks so as to maximise resource extraction by removing the need for stability pillars. This is because, currently, the mining operations at Dabwam village have reached critical depths shown by the ever increasing induced mining stresses posing challenging ground conditions that require stabilisation. Reports from different departments have shown that recovery has been low due to dilution and therefore the consulting companies have strongly advised Dabwam to carry out a mine-wide systematic backfill operation into stoping activities.
This research was therefore initiated by Plateau Mineral Development Company to establish the need of backfilling in the steep dipping areas and also depending on the mining method used to clarify what would be the behaviour of the stopes assuming that the mine does not carry out any backfilling in these areas of the underground operations. It is the aim of this proposed research also to show at what point, in terms of depth, the stopes will pose a risk to the surrounding mining activities if not backfilled. Therefore, it is the scope of this research work to ascertain the need for backfilling in the steep dipping areas of the mine.
Departments
- Accounting Projects [85]
- Accounting And Management Projects [6]
- Accounting Education Projects [1]
- Adult And Primary Education Projects [6]
- Agricultural And Bio-environmental Engineering Technology Projects [8]
- Agricultural Economics And Extension Projects [57]
- Agricultural Engineering Projects [3]
- Agricultural Technology Projects [1]
- Agriculture Projects [104]
- Agriculture Education Projects [3]
- Anatomy Projects [1]
- Architecture Projects [28]
- Banking And Finance Projects [53]
- Basic Medical Sciences Projects [1]
- Biochemistry Projects [25]
- Biological Sciences Projects [46]
- Biology Education Projects [13]
- Botany Projects [3]
- Building Projects [58]
- Business Administration Projects [151]
- Business Studies Projects [76]
- Chemical Engineering Projects [24]
- Chemistry Education Projects [3]
- Civil Engineering Projects [80]
- Community Health Projects [35]
- Computer Education Projects [6]
- Computer Engineering Projects [28]
- Computer Science Projects [138]
- Construction Engineering And Management Projects [1]
- Cooperative Economics Projects [0]
- Cooperative Economics And Management Projects [2]
- Criminology Projects [68]
- Cyber Security Projects [2]
- Data Science Projects [1]
- Economics Projects [107]
- Economics Education Projects [1]
- Education Projects [189]
- Educational Foundation Projects [9]
- Educational Management Projects [44]
- Electrical/electronics Engineering Projects [140]
- English Education Projects [14]
- English Language Projects [6]
- English Language And Literature Projects [18]
- Entrepreneurship Projects [7]
- Environmental Science Projects [79]
- Epidemiology And Community Health Projects [2]
- Estate Management Projects [40]
- Fashion & Design Projects [1]
- Fine Art Projects [1]
- Food And Nutrition Projects [2]
- Food Science And Technology Projects [52]
- Geography Projects [24]
- Geography Education Projects [4]
- Government And Public Administration Projects [1]
- Guidance And Counselling Projects [132]
- Health Education Projects [9]
- Health Information Management Projects [3]
- History And International Studies Projects [3]
- Human Kinetics And Healthy Education Projects [2]
- Human Resources Management Projects [111]
- Industrial Relations And Personnel Management Projects [58]
- Information And Communication Technology Projects [2]
- Institute Of Education Projects [1]
- Insurance And Risk Management Projects [1]
- International Relations Projects [55]
- Islamic Studies Projects [3]
- Law Projects [21]
- Leisure And Tourism Management Projects [2]
- Library And Information Science Projects [85]
- Linguistics Projects [104]
- Marketing Projects [78]
- Mass Communication Projects [188]
- Mathematics Projects [3]
- Mathematics Education Projects [1]
- Mechanical Engineering Projects [86]
- Medical And Health Science Projects [82]
- Medical Laboratory Science Projects [2]
- Medical Radiography Projects [2]
- Medicine And Surgery Projects [2]
- Metallurgical Engineering Projects [2]
- Microbiology Projects [120]
- Minerals And Petroleum Resources Engineering Projects [32]
- Mining Engineering Techology Projects [2]
- Nursing And Nidwiffery Projects [124]
- Office Technology Management Projects [104]
- Parasitology And Entomology Projects [3]
- Petroleum Engineering Projects [3]
- Pharmacy Projects [18]
- Philosophy Projects [111]
- Physics Projects [3]
- Physiology Projects [1]
- Political Science Projects [123]
- Primary Education Projects [5]
- Project Management Projects [1]
- Psychology Projects [61]
- Psychology Education Projects [1]
- Public Administration Projects [123]
- Public Health Projects [100]
- Purchasing And Supply Projects [112]
- Pure And Industrial Chemistry Projects [8]
- Quantity Surveying Projects [59]
- Science Education Projects [4]
- Science Laboratory Technic Projects [108]
- Science Laboratory Technology (stl) Projects [21]
- Secretarial Administration Projects [40]
- Sex Education Projects [2]
- Social Studies Projects [8]
- Sociology Projects [126]
- Statistics Projects [107]
- Surveying And Geoinformatics Projects [4]
- Theology Projects [9]
- Transportation And Management Projects [3]
- Urban & Regional Planning Projects [1]
- Value Engineering Projects [1]
- Vocational Education Projects [1]
- Zoology Projects [1]